Project Description
Bulford Army Camp
Two large storage buildings, 3000m2 and 1000m2 constructed on traditional reinforced pad and deep strip foundations. Particularly challenging was the construction of the reinforced concrete floor slabs incorporating under floor heating in conjuction with a myriad of different types of construction joints necessitating pin point accuracy in lines and levels.
6000m2 of tarmac surfacing dominates the external paving areas on the associated roads and carpark areas all of which are drained by the incorporation of 250m of “Aco” channel drainage.
Project Details
CLIENT
Mears New Homes Ltd
PROJECT TYPE
Commercial